BOM Inquiry different than actual Work Order Requirement
My Bom inquiry shows conversion is correct, but the actual work order shows a different conversion. I believe this has to do with a bug related to UOM measure.
The Item name is BS-2.4mm8S-5T and has a base unit type of kgs and a prime consumption unit of “2.4mm8S-5T Springs”.
Details are below-
https://www.notion.so/nishf/ERP-Bom-issue-Difference-between-BOM-Inquiry-and-Actual-WO-qty-37589f46867e4644af8aaed638c86bde