-
I am trying to setup outsourced manufacturing and went through the available documentation and completed the recommended setups in sandbox. …
- 76 views
- 3 answers
- 0 votes
-
I’ve recently noticed we have a lot of closed Sales Orders with associated Work Orders and Assembly Builds that are …
- 81 views
- 0 answers
- 0 votes
-
We quote assemblies according to a formula: $MC = Cost of Major Components $mc = Cost of Minor Components = …
- 116 views
- 0 answers
- 0 votes
-
I have a component that is used in a couple thousand BOM revisions. I need to change the BOM quantity …
- 168 views
- 1 answers
- 0 votes
-
We are using serialized assembly items. I have found that once an item is built with a serial number, then …
- 227 views
- 2 answers
- 0 votes
-
I would like to know if it is possible create all the Quality Inspections when a work order is created.
- 168 views
- 0 answers
- 0 votes
-
I just finished creating a Composite Barcode Template. Do I now have to create an xml that contains a QR …
- 192 views
- 0 answers
- 0 votes
-
Hi Everyone, Does anyone tried to transform an assembly build to assembly unbuild using suitescript? If yes do you have …
- 171 views
- 1 answers
- 0 votes
-
Hi Expert, How to input additional cost (except raw material) such as “accrued expense” on work order ? the …
- 149 views
- 0 answers
- 0 votes
-
When attempting to stage items for an assembly build our instance of NetSuite seems draconian in terms of how much …
- 209 views
- 1 answers
- 0 votes