Alter Scheduled time for Map/Reduce deployment using SuiteScript
I want to be able to change the frequency and start time of a deployment of a map/reduce script but from server side (or client side if necessary) code. This may not sound smart but believe me it’s to keep me from doing something even dumber
https://system.na0.netsuite.com/app/help/helpcenter.nl?fid=section_3753014009.html lists restrictions on suitescript’s access to deployment records.
If you really wanted to, you can use javascript from the console to try manipulating the script depoyment.
Doesn’t seem like `starttime`, or `startdate` are manipulable within suitescript. You could perhaps have a bunch of deployments with certain preferred schedules, and turn them on or off dynamically (the deployment status is scriptable).
Okay this is the type of out of the box solution I like. This might actually work
@SouthsideSandii – Thank you so much for this suggestion!



